One Hammersmith Broadway

Pillar Ventures had planed a special event to be laid on for the English and Australian cricket teams when the Ashes series was played in the UK. It was to be held in their office block café/break out area at One Hammersmith Broadway.

The work entailed removing the existing ceiling to leave the services above exposed. As a full survey was not possible prior to commencing the project, slightly more alteration work to the HVAC and sprinkler systems was required in order to make these presentable enough for display.

Our joinery team worked with the designers to develop designs from concept visuals into working drawings, all of which was achieved within a tight and demanding timescale that had to be met. The project was delivered on time despite the normal difficulties such as noise and delivery restraints.